CNBT 1359 Project Scheduling
Course Information
Course Description
CNBT 1359. PROJECT SCHEDULING (3-0-3) A study of conventional scheduling using critical-path method; precedence networks; bar charts; monthly reports; and fast track scheduling. Prerequisite: ARCH 2312. Assessment Levels: R2, E1, M2. 15.1001
Prerequisite(s)
Prerequisites: ARCH 2312. Must have level 2 in Reading and Math and level 1 in English.